Toll Free: 1-800-545-5420
Section Name

Application Rates

Topical only Undiluted concentrate

Parts Water

Traffic Area Dilution Life/
months
Standard Metric gal./
Acre
gal./
SY

ft²/gal.

gal./ft² yd²/gal. gal./yd² gal./
acre
m²/gal gal./m² m²/L L/m²

Water Retention Basin & Pond Lining

10

0.100

1.1

0.90

4360

0.9

1.08

0.2

4.07

1

No

8800

1.80

6-12

Aircraft Runways (Heavy use)

15

0.067

1.7

0.60

2910

1.4

0.72

0.4

2.72

1

Yes

5900

1.20

6-12

Aircraft Runways (single engine)

25

0.040

2.8

0.36

1750

2.3

0.43

0.6

1.63

3

Yes

7000

1.40

6-12

Helicopter Landing Pads (Heavy Craft)

20

0.049

2.3

0.44

2130

1.9

0.53

0.5

1.99

2

Yes

6400

1.30

6-12

Helicopter Landing Pads (Light Craft)

35

0.029

3.9

0.26

1250

3.3

0.31

0.9

1.16

4

Yes

6300

1.30

6-12

Heavy Haul Roads & Mining Roads

30

0.033

3.3

0.30

1460

2.8

0.36

0.7

1.36

3

Yes

5900

1.20

6-12

Military Convoy & Supply Roads

35

0.029

3.9

0.26

1250

3.3

0.31

0.9

1.16

3

Yes

5000

1.00

6-12

Roads (High Traffic)

35

0.029

3.9

0.26

1250

3.3

0.31

0.9

1.16

3

Yes

5000

1.00

6-12

Residential Driveways

45

0.022

5.0

0.20

970

4.2

0.24

1.1

0.91

4

Yes

4900

1.00

6-12

Parking Lots

45

0.220

5.0

0.20

970

4.2

0.24

1.1

0.91

4

Yes

4900

1.00

6-12

Roads (Light Traffic)

45

0.022

5.0

0.20

970

4.2

0.24

1.1

0.91

4

Yes

4900

1.00

6-12

Golf Course Bunker Liner

25

0.040

2.8

0.36

1750

2.3

0.43

0.6

1.63

2

Yes

5300

1.10

6-12

Golf Course Cart Paths

60

0.017

6.7

0.15

730

5.6

0.18

1.5

0.68

6

Yes

5200

1.10

6-12

Walking Trails and Paths

80

0.013

8.9

0.11

550

7.4

0.13

2.0

0.51

8

Yes

5000

1.00

6-12

Road Sealer over gorillasnot Stabilized Base

80

0.013

8.9

0.11

550

7.4

0.13

2.0

0.51

3

Yes

2200

0.50

6-12

BMX Tracks

55

0.018

6.1

0.17

800

5.1

0.20

1.3

0.75

4

Yes

4000

0.80

6-12

Temporary Parking Lots

55

0.018

6.1

0.17

800

5.1

0.20

1.3

0.75

4

Yes

4000

0.80

1-3

Temporary Roads & Detours

70

0.014

7.8

0.13

630

6.5

0.15

1.7

0.58

6

Yes

4500

0.90

1-3

Road Shoulders

75

0.013

8.3

0.12

590

7.0

0.14

1.8

0.54

6

Yes

4200

0.90

6-12

Slope Erosion Control (Steep Slope)

70

0.014

8.0

0.13

630

7.0

0.15

2.0

0.58

3

No

2600

0.54

6-12

Slope Erosion Control (Average Slope)

125

0.008

14.0

0.07

350

12.0

0.09

3.0

0.33

6

No

2500

0.52

6-12

Slope Erosion Control (Light Slope)

150

0.007

17.0

0.06

300

14.0

0.07

4.0

0.27

8

No

2700

0.56

6-12

Stock Pile Dust Capping (Steep Slope)

150

0.007

17.0

0.06

300

14.0

0.07

4.0

0.27

6

No

2100

0.43

6-12

Stock Pile Dust Capping (Average Slope)

175

0.006

19.0

0.05

250

16.0

0.06

4.0

0.23

7

No

2000

0.41

6-12

Stock Pile Dust Capping (Light Slope)

200

0.005

22.0

0.05

220

19.0

0.05

5.0

0.20

8

No

2000

0.41

6-12

Hazardous Material Capping & Sealing

100

0.010

11.0

0.09

440

9.0

0.11

2.0

0.41

5

No

2700

0.56

6-12

Landfill Capping & Reclamation

225

0.004

25.0

0.04

200

21.0

0.05

6.0

0.18

6

No

1400

0.29

6-12

Odor & Vapor Suppression

175

0.006

19.0

0.05

250

16.0

0.06

4.0

0.23

9

No

2500

0.52

3-10

Mine Tailiings Capping & Reclamation

290

0.003

32.0

0.03

160

27.0

0.04

7.0

0.14

8

No

1500

0.31

6-12

Coal Rail Car Capping

500

0.002

56.0

0.02

90

46.0

0.02

12.0

0.08

14

No

1400

0.29

1-3

Dust Control (30 Days)

675

0.001

75.0

0.01

65

63.0

0.02

17.0

0.06

18

No

1300

0.27

1+

Dust Control (90 days)

435

0.002

48.0

0.02

100

40.0

0.02

11.0

0.09

11

No

1300

0.27

3+

Dust Control (6 Months)

320

0.003

36.0

0.03

137

30.0

0.03

8.0

0.13

8

No

1300

0.27

6+

Dust Control (12 Months)

220

0.005

24.0

0.04

192

20.0

0.05

5.0

0.19

6

No

1400

0.29

12+

Dust Control (12-24 Months)

158

0.006

18.0

0.06

275

15.0

0.07

4.0

0.26

4

No

1400

0.29

12-24

Hydroseed & Hydromulch Tackifier

800

0.001

89.0

0.01

55

74.0

0.01

20.0

0.05

18

No

1100

0.23

3-6

(Mixed-In/Processed)

Base Stabilization Light (4"-10cm deep)

25

0.040

2.8

0.40

1750

2.3

0.40

0.6

1.60

**

Base Stabilization Average (4"-10cm deep)

20

0.050

2.2

0.50

2180

1.9

0.50

0.5

2.00

**

Base Stabilization Heavy (4"-10cm deep)

15

0.070

1.7

0.60

2910

1.4

0.70

0.4

2.70

**

Road Pot Hole Repair (4"-10cm deep)

20

0.050

2.2

0.50

2180

1.9

0.50

0.5

2.00

**

Adobe Blocks & Earth Blocks (6"-15cm Tall)

20

0.050

2.2

0.50

2180

1.9

0.50

0.5

2.00

**

Base Stabilization Light (6"-15cm deep)

20

0.050

2.2

0.50

2180

1.9

0.50

0.5

2.00

**

Base Stabilization Average (6"-15cm deep)

15

0.070

1.7

0.60

2910

1.4

0.70

0.4

2.70

**

Base Stabilization Heavy (6"-15cm deep)

10

0.100

1.1

0.90

4360

0.9

1.10

0.2

4.10

**

** Dilution rates for mix-in/processed applications are based on the difference between optimum moisture and in-situ moisture levels. Please consult with your local Gorilla-Snot® representative to calculate recommended dilution rates for all mix-in applications.

Application coverage and dilution rates may vary depending on traffic volume, load bearing capacity, soil type, weather conditions, soil moisture levels, and compaction. All mixed-in/Processed applications require laboratory and on-site testing to determin optimal application and dilution rates.